Afdrukken

Amsterdam 16-4-2014

Thanks to our sponsor Ergodyne USA, we were able to build a toilet block incl. water tank. Total construction costs incl. septic tank: euro 1500,-

ergodyne-5

 

 

 

Ergodyne-Logo

Project sponsor:

Ergodyne, a Division of Tenacious Holdings, Inc.
1021 Bandana Boulevard East // Suite 220 // St. Paul, MN USA 55108 // www.ergodyne.com

Toilet bloc constructed: Inauguration 16/4/2014